Our Projects
Commercial Property -Phase 2 Environmental Site Assessment
702 Kingsway Avenue SE, Medicine Hat, Alberta. Scope of work: Site Inspection, Drilling Boreholes, Installation of Monitoring Wells, Sampling and Analytical Laboratory Testing of Soil and Groundwater, Reporting in accorance with current CSA and Provincial Standard of each Juridiction.
View DetailsQuality Control for 4 Ave NE – Water & Sewer Main Replacement
Medicine Hat, Alberta Scope of work: Geo-material Quality Control Testing (Density Testing, Geotehcnical Services, Concrete, Testing)
View DetailsQuality Control for Pickford Road Bridge RM of Maple Creek
Client: Western Infrastructure Renewal Inc. on Behalf of RM of Maple Creek , SK
View DetailsPhase 2 Environmental Site Assessment
1549 30 Street SW (Plan 7611212, Block 1, Lot 2) Medicine Hat, Alberta Scope of work: Site Inspection, Drilling Boreholes, Installation of Monitoring Wells, Sampling and Analytical Laboratory Testing of Soil and Groundwater, Reporting in accorance with current CSA and Provincial Standard of each Juridiction.
View DetailsPhase 1 Environmental Site Assessment
Grassy lake, Alberta Scope of work: Record Review, Interviews, Site Inspection, Reporting.
View DetailsProposed Range Road 71 Upgrade
Cypress County, Alberta Scope of work: Geotechnical Evaluation and recommendations for pavement structure. Geo-material Quality Assurance Testing (Density Testing, Geotehcnical Services, Proof Roll Tests, Asphalt Testing-Marshall Analyis and Coring).
View DetailsPavement Structure Design Parking Lot Addition and Elevated Walkway Structure
Client: JBS Meat Packing Plant
View DetailsPavement Structure Assessment, Pelletizer/HTU Building Expansion & Pile Inspection
Location: Cancarb Facility Site, Alberta Scope of work: Geotechnical Evaluation and recommendations for soil parameters for foundation design and pavement structure and Quality Assurance Testing
View DetailsProposed Starbucks and CRU Building Development
Location: 511 ‐ 4th Avenue NE, Medicine Hat, Alberta Scope of work: Geotechnical Evaluation and recommendations for soil parameters for foundation design and pavement structure.
View DetailsQuality Control for Bridge Construction
Location: Highway 21 Over Maple Creek & Belanger Creek Bridge
View DetailsMulti-use Development for Trico Homes
Client: Trico Homes Scope: Material Testing, Geotechnical Inspection and Environmental Soil and Groundwater Monitoring.
View DetailsQuality Control Material Testing for KEYSTONE XL RFP 10280012
Client: Graham Industrial Services LP
View DetailsConcrete Apron V Repairs -Northgate Aviation Material Testing Quality Control (QC) Services
Client: Dufferin Construction (A CRH Company) on behalf of Calgary International Airport Authority (YYC) Scope of work: Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill). Portland Cement Concrete Pavement Testing (on site and lab Cylinders and Beams)
View DetailsGeotechnical Investigation Pavement Condition Assessment
Geotechnical Investigation Pavement Condition Assessment-Black and White Road, Twp Rd 114 to 84, Cypress County, Alberta Client: Al-Teara Engineering Ltd. on behalf of Cypress County
View DetailsCyprees Wind Project
Cyprees Wind Project near Medicine Hat, Cypress County-Construction of a 248.8 MW wind power projects consisting of 48 wind turbines during 2021-2022 (Estimated Cost:250 M), Developer: EDF EN Canada. Client: MasTec Canada Scope of work: Geotechnical Service Proof Roll Test and DCP/SCP Test for tower foundation subgrade; Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); Concrete Testing; Grout Testing; and Compliance letter by a professional geotechnical engineer.
View DetailsStrathmore Solar Farm Project
Strathmore Solar Farm Project - 40.5 megawatt solar facility located on 320 acres of industrial land in the Town of Strathmore , Alberta (completed on 2022) Estimated Cost:60 M), Developer: Capital Power. Client: Borea Construction Scope of work: Soil Bearing Test Geotechnical Service for Substation foundation subgrade; Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete Testing.
View DetailsStrathmore East Solar Farm Project
Strathmore East Solar Farm Project - 20.5 megawatt solar facility located in Wheatland County, Alberta (completed on 2022) Estimated Cost:30 M, Developer: Elemental Energy. Client: Borea Construction Scope of work: Soil Bearing Test Geotechnical Service for Substation foundation subgrade; Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete Testing;
View DetailsChappice Lake Solar Storage Project
Chappice Lake Solar Storage Project- 15 MW solar farm is located 35 km north of Medicine Hat in Cypress County, Alberta (during 2022-2023) Estimated Cost:40.3 M, Developer: Elemental Energy. Client: miEnergy & PME Inc Scope of work: Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill)
View DetailsMichichi Solar Generation Facility
Michichi Solar Generation Facility - Construction of a 61 MW solar facility located just north of Drumheller in Starland County, Alberta (during 2022-2023) Estimated Cost:65 M, Developer: Capstone Infrastructure. Client: Borea Construction Scope of work: Soil Bearing Test Geotechnical Service for Substation foundation subgrade; Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete Testing;
View DetailsQuality Control Material Testing Drumheller Resiliency & Flood Mitigation Dike Construction
Quality Control Material Testing Drumheller Resiliency & Flood Mitigation Dike Construction ( Grove Plaza, Willow Estates and Midland), Drumheller (during 2022-2023) Client: Wilco Southwest Scope of work: Laboratory Testing (Aggregates, Rip Rap, Soil) Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete and Asphalt Testing.
View DetailsMaterial Testing Quality Assurance
Material Testing Quality Assurance (QA) Services Standing offer (2019 to current date) various place, City of Medicien Hat, Alberta Client: City of Medicine Hat Scope of work: Earthworks Material Testing (Compaction Testing of Asphalt, Soil, Aggregates and Concrete ).
View DetailsBridge replacement over the Herbert canal
Bridge replacement over the Herbert canal, west of Rush Lake on Hwy 1 , Saskatchewan - Material Testing Quality Control (QC) Services (Construction of Two Short Span Bridges and Road work) Client: Harbuilt Construction Mangament Ltd. Scope of work: Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); Asphalt Testing & Concrete Testing.
View DetailsCoulee Ridge Phase 2 & 2B
Coulee Ridge Phase 2 & 2B, Medicine Hat, Alberta- Material Testing Quality Control (QC) Services (Construction of Road work and Underground Services) Client: Industrial Backhoe Ltd. Scope of work: Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill). Concrete Testing.
View DetailsTownship Road
Township Road#Twp Rd#170: Rge Rd.#11 TO: Hwy# 41, Cypress County, Alberta- Material Testing Quality Control (QC) Services (Construction of Road work and Underground Services) Client: White Fox Group Scope of work: Earthworks Material Testing for Road Grading (Compaction Testing of Soil and Aggregates associated with an engineered fill).
View DetailsWater & Sanitary Main Replacement PRV Renewals
Water & Sanitary Main Replacement PRV Renewals, 3rd Street, Chinook Dr., Medicine Hat, Alberta- Material Testing Quality Control (QC) Services (Construction of Road work and Underground Services) Client: UG Excavating Contracting Services Ltd. Scope of work: Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill). Concrete Testing.
View DetailsJenner Wind Project (Phase 2, and 3
Jenner Wind Project (Phase 2, and 3), near Jenner, Special Area No. 2- Construction of a 303 MW of (Phase 1, 2 & 3) wind power projects consisting of 38 wind turbines (Estimated Cost:400 M), Developer: Potentia Renewables Inc. Client: Berea Construction ULC. Scope of work: Geotechnical Service in 2023 Third Party Opinion Stabilization of 8 Numbers of Crane Pad Foundation specific to DCP Test and Geotechnical Recommendation for stabilization measure.
View DetailsConcrete Pavement Apron Restoration Material Testing Quality Control (QC) Services
Concrete Pavement Apron Restoration Material Testing Quality Control (QC) Services (2021-2023) Client: Dufferin Construction (A CRH Company) on behalf of Calgary International Airport Authority (YYC) Scope of work: Trial Mix for concrete and Cement Stabilized Base (CSB) Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill). Cement Stabilized Base (CSB) Testing Portland Cement Concrete Pavement Testing (on site and lab Cylinders and Beams)
View DetailsGrizzly Bear Wind Power Project
Grizzly Bear Wind Power Project near Vermillion located 170 km east of Edmonton, Minburn County No. 27-Construction of a 152 power consisting of 34 wind turbines in 2022 (Estimated Cost:250 M), Developer: Enel Green Power. Client: Pennecon clo Allnorth Scope of work: Geotechnical Service DCP/SCP Test for tower foundation subgrade; Earthworks Material Testing (Proof Roll Test and Compaction Testing of Soil and Aggregates associated with an engineered fill); Compliance letter by a professional geotechnical engineer.
View DetailsKneehill Solar Project
Kneehill Solar Project- Construction of a 25 MW solar facility located north of the Town of Three Hills in Kneehill County, Alberta (during 2022-2023) Estimated Cost:65 M, Developer: Capstone Infrastructure. Client: Borea Construction Scope of work: Soil Bearing Test Geotechnical Service for Substation foundation subgrade; Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete Testing
View DetailsQuality Control Material Testing Drumheller Resiliency & Flood Mitigation Dike Construction
Quality Control Material Testing Drumheller Resiliency & Flood Mitigation Dike Construction ( Grove Plaza, Willow Estates and Midland), Drumheller (during 2022-2023) Client: Wilco Southwest Scope of work: Laboratory Testing (Aggregates, Rip Rap, Soil) Earthworks Material Testing (Compaction Testing of Soil and Aggregates associated with an engineered fill); and Concrete and Asphalt Testing.
View DetailsWild Rose Wind Farm Phase 2
Southeast of Medicine Hat, Cypress County - Under Construction of a 192 MW wind power plant consisting of 38 wind turbines shedule 2023-2024 (Estimated Cost:360 M), Developer: Capstone Infrastructure
View DetailsProposed Haven Colony Development
Golden Prairie, RM of Big Stick#141, Saskatchewan Scope of work: Geotechnical Evaluation and recommendations for soil parameters for foundation design and Quality Control Test for batching Plant and Density Test for Wastewater Lagoon
View DetailsFedEx Ground Warehouse Building
Scope: Quality Assurance Material Testing and Geotechnical Inspection Services.
View DetailsQuality Control for Testing MHS-10 Box Spring Substation Underground Trench
Backfill for ENMAX Power Services (Utility Distribution Construction)
View DetailsServing Happy Clients Over the Years
REQUEST A QUOTE TODAY
Our dedicated team of geotechnical and environmental specialists is ready to provide tailored solutions for your next project. Contact us for accurate assessments and professional consultations.
TECHNICAL SUPPORT? CALL OUR ENGINEERS